Mortenson Construction Creates High-quality Alignments for Challenging Wind Farm Road Construction with the Trimble Quantm Alignment Planning System
Mortenson generates dozens of highly-viable 3D alignments, performs more in-depth route optimization, and generates accurate cost analysis in days compared to months with Trimble Quantm Desktop
Trimble Alignment Planning: Reducing Costs While Minimizing Environmental Impacts
"The ability to quickly test a wide range of alignment options in the context of all of the key environmental and physical constraints, as well as the main design and cost parameters, was critical to achieving the objectives of this study" - Parsons Brinckerhoff, Inc.
Trimble Alignment Planning: Planning Short Projects in Tight Corridors
"We achieved a 13% saving on alignment construction cost even though the tightly constrained corridor limited options." Opus International Consultants
Trimble Alignment Planning: Thiess enhances alignment planning capabilities and reduces construction costs for Queensland rail project
"Clients are coming to us for recommendations on how to get the most for their money, and that's the value of Trimble Quantm. It helps to identify different scenarios very quickly, actually providing a more finite and achievable design solution." Byron Watkins, Survey Data Manager, Thiess (head office)
Trimble Alignment Planning: Portugal HSL high speed rail reduces costs by 10%
In Portugal, Trimble Planning Solutions was commissioned to provide the Trimble® Quantm™ technology for the Lisbon to Madrid High Speed Rail Project.
Trimble Alignment Planning: 660 Kilometer (410.1 Mile) Beijing-Shenyang High Speed Rail Project
The 660 kilometer (410.1 mile) Beijing-Shenyang high speed rail project is part of the China national high speed rail network with a design speed of 350 kilometers per hour (217.4 miles per hour).
150 Kilometer (93.2 Mile) Zhejiang Huangqunan Expressway Project
Trimble Alignment Planning: Quickly review, assess and present multiple alignment results
Trimble Alignment Planning: 30 Kilometer (18.6 Mile) Shaoshan-Ganzhou Railway Project
The Shaoshan-Ganzhou railway project was a mixed passenger and freight line with a design speed of 200 kilometers per hour (124.2 miles per hour) and limiting grade of 6 percent.
Trimble Alignment Planning: Boulder City Bypass, Nevada United States of America
Carter & Burgess and the Nevada Department of Transportation (NDOT) commissioned the Trimblel® Quantmtm Alignment Planning System as a
Trimble Alignment Planning: Planning that protects the environment and cuts cost
Trimble Alignment Planning was able to greatly improve the collaboration between the engineering and environmental project teams.
Trimble Alignment Planning: A highway corridor planning process for NEPA compliance
ITD and David Evans and Associates, Inc with the assistance of the Trimble Alignment Planning system have implemented a highway corridor planning / environmental / engineering process to establish highway corridors and select alternatives that will co
Trimble Alignment Planning: Bauhina Mine Regional Rail Project
The project planners demonstrated that there is significant benefit to applying the Trimble Alignment Planning system to mine haul/access roads, and have stated that the earlier Trimble Alignment Planning is applied, the greater the benefits.
Trimble Alignment Planning: Toowoomba Western Section Bypass
The QDMR planners demonstrated that there is significant benefit to applying the Trimble Alignment Planning system to highway projects, even where the corridor is very narrow and the terrain is flat to rolling.
Trimble Alignment Planning: 1,000 mile I-69 Trans-Texas Corridor Study - Tier One
Trimble Alignment Planning, in conjunction with EPA GISST Data, was extremely effective in Preliminary Corridor Development during the Corridor Alternatives Evaluation Process.